Legacy at Millennium Park Land Surveys
 
Gremley and Biedermann were contracted to do Alta/ NSPS surveys, Air Rights Division, historical facade location, building/ damage control and skybridge locations. The historical facade was to remain as construction of the 73 story building took place behind.

Here we see a survey done of lot one in block 3 in Ashland addition to Chicago, being a re subdivision of the overall Chicago subdivision. This survey seems to also require a vertical component in the Chicago City Vertical Datum system. I am sure I will cover more on CCD, or Chicago City Datum, in later posts as they arise.
 









